Below are arrival and service times of four single-server queues. (Hint: Mean arrrival time of 4 and mean service time of 3 are the same across all the queues, but their ranges are different.) (Queue W) Customer: 1 2 4 5 8 Mean Arrival times (hrs): 3 4 3 5 5 5 Service times (hrs): 1 4 5 2 1 3 P 100 w WIN и NN 4 4 NI Ne
(Queue X) Customer Arrival times (hrs): Service times (hrs): 1 3 2 3 3 4 5 5 4 6 5 3 7 4 2 8 Mean 5 4 3 3 4 4
(Queue Y) Customer: Arrival times (hrs); Service times (hrs): 1 4 3 2 7 mim 4 5 2 5 1 4 6 2 NN 8 Mean 6 4 2 3 4 4
(Queue Z) Customer: Arrival times (hrs): Service times (hrs): 1 4 1 2 7 5 3 3 4 4 5 2 5 1 4 6 2 5 8 Mean 6 4 1 3 3
5. (American Vending) Use the posted queueing template. For one repair worker, the average flow time (W) is For two repair workers, the average flow time (W) is For three repair workers, the average flow time (W) is
A. 0.4, 0.204, 0.225
B. 0.5, 0.204, 0.225
C. 0.4, 0.225, 0.204
D. 0.5, 0.225, 0.204
E. 0.4, 0.304, 0.325
F. 0.5, 0.304, 0.325
G. 0.4, 0.325, 0.304
H. 0.5, 0.325, 0.304
6. (American Vending) Use the Little's law to find average down machines in the entire system (L). (Note: To avoid rounding errors, use exactly the same average flow time (W) in the previous question.) -- For one repair worker, average down machines in the entire system (L) are For two repair workers, average down machines in the entire system (L) are For three repair workers, average down machines in the entire system (L) are
A. 1.5, 0.61, 0.68
B. 2.5, 0.61, 0.68
C. 1.5, 0.68, 0.61
D. 2.5, 0.68, 0.61
E. 1.5, 0.71, 0.78
F. 2.5, 0.71, 0.78
G. 1.5, 0.78, 0.71
H. 2.5, 0.78, 0.71 7.
(American Vending) Each repair worker is paid $4 per hour and downtime costs the company $25 per hour per machine. Calculate total cost (= worker cost + downtime cost). (Note: To avoid rounding errors, use exactly the same average number of down machines (L) in the previous question.) --- For one repair worker, total cost is -- For two repair workers, total cost is --- For three repair workers, total cost is
A. 21.5, 15, 17.25
B. 41.5, 15, 17.25
C. 21.5, 17.25, 15
D. 41.5, 17.25, 15
E. 21.5, 25, 27.25
F. 41.5, 25, 27.25
G. 21.5, 27.25, 25
H. 41.5, 27.25, 25
8. (American Vending) The optimal crew size is
A. 1 E 5
B. 2 F. 6
C. 3 G. 7
D. 4 H. 8

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, krishawnnn
Shiny white dental insurance costs $258 per year. approximately one-third of insured people need a filling, which averages $110 each. 80% of insured people get a preventive check-up each year, and the average cost of this visit is $95. if you consider shiny white’s income and expenses, what is the expected value of each insured customer?
Answers: 1
image
Mathematics, 21.06.2019 19:30, Echo009
Asurvey of 2,000 doctors showed that an average of 3 out of 5 doctors use brand x aspirin. how many doctors use brand x aspirin
Answers: 1
image
Mathematics, 22.06.2019 00:30, floverek
Roy has 4 1/2 pizzas for the soccer team to split after the game. if each member is going to get 1/2 of a pizza, how many players are on the soccer team
Answers: 1
image
Mathematics, 22.06.2019 00:30, benchang3621
Find the values of the variables and the lengths of the sides of this kite.
Answers: 3
Do you know the correct answer?
Below are arrival and service times of four single-server queues. (Hint: Mean arrrival time of 4 and...

Questions in other subjects:

Konu
Mathematics, 25.02.2021 21:30