Mathematics
Mathematics, 19.10.2020 15:01, bobbycisar1205

56 men can do a work in 42 days then how many men will do the same work in 14 days

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, villarrealc1987
The function models the number of accidents per 50 million miles driven as a function
Answers: 1
image
Mathematics, 21.06.2019 21:50, heavendl13
Which equation shows the quadratic formula used correctly to solve 5x2 + 3x -4 0 for x? cos -3+ v (3) 2-4() 2(5) 3+ |(3)² +4() 205) 3+ (3) 2-4() -3+ v (3)² +4()
Answers: 1
image
Mathematics, 21.06.2019 22:30, jcazares3558
Abag contains 10 white golf balls and 6 striped golf balls. a golfer wants to add 112 golf balls to the bag. he wants the ratio of white to striped gold balls to remain the same. how many of each should he add?
Answers: 2
image
Mathematics, 22.06.2019 02:30, byler47
The floor of a building consists of 3000 tiles which are rhombus shaped and each of it's diagonals are 45 cm and 30 cm in length. find the total cost of polishing the floor, if the cost per m² is rs. 4.
Answers: 1
Do you know the correct answer?
56 men can do a work in 42 days then how many men will do the same work in 14 days...

Questions in other subjects:

Konu
Mathematics, 24.03.2020 07:20
Konu
Spanish, 24.03.2020 07:20
Konu
Mathematics, 24.03.2020 07:21
Konu
Mathematics, 24.03.2020 07:21
Konu
History, 24.03.2020 07:21