Mathematics, 18.10.2020 14:01, lorrainelopez
A construction worker needs to move 120 ft of dirt by using a wheelbarrow. One
wheelbarrow load holds 8 ft' of dirt and each load takes him 10 minutes to complete. One
correct way to figure out the number of hours he would need to complete this job is
Answers: 1
A construction worker needs to move 120 ft of dirt by using a wheelbarrow. One
wheelbarrow load hol...