Awall can be built by 6 men working 8 hours per day in 5 days. how many days will it take 4 men to build the wall if they work only 5 hours per day?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:40, annie1799
The perimeter of a rectangle is greater than or equal to 74 meters. if the length is 25 meters, the minimum width of the rectangle is meters.
Answers: 2
image
Mathematics, 21.06.2019 18:30, chandranewlon
Agraphic designer created a logo on eight and a half by 11 inch paper. in order to be placed on a business card, the logo needs to be one and 7/10 inches by 2 and 1/5 in. what is the scale factor of the dilation
Answers: 1
image
Mathematics, 21.06.2019 21:30, bakoeboo
The map shows the location of the airport and a warehouse in a city. though not displayed on the map, there is also a factory 112 miles due north of the warehouse. a truck traveled from the warehouse to the airport and then to the factory. what is the total number of miles the truck traveled?
Answers: 3
image
Mathematics, 22.06.2019 00:20, kellygaytan
20 ! need ! which exponential function is represented by the table? f(x) = 0.2(0.5x)f(x) = 0.5(5x)f(x) = 0.5(0.2x)f(x) = 0.2(0.2x)
Answers: 1
Do you know the correct answer?
Awall can be built by 6 men working 8 hours per day in 5 days. how many days will it take 4 men to b...

Questions in other subjects:

Konu
Mathematics, 18.04.2020 23:56
Konu
Mathematics, 18.04.2020 23:57