Mathematics
Mathematics, 16.10.2020 07:01, shaheedbrown06

Graph. Use linear programming to answer to find the maximum profit. A manufacturer makes snowboards and wakeboards. The company profits $8 for each snowboard and $12 for each wakeboard. There are two components to the production of the boards, assembly and finishing. Each snowboard requires 4 hours for assembly and 2 hours for finishing. Each wakeboard requires 7 hours for assembly and 4 hours for finishing. The company allows at most 112 hours per week to assemble and 60 hours a week to finish. of each board should the manufacturer make to maximize profit? How much is that maximum profit?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, bobjill1609
The center of the circumscribed circle lies on line segment and the longest side of the triangle is equal to the of the circle.
Answers: 2
image
Mathematics, 21.06.2019 18:30, Raewolf25
Need an artist designed a badge for a school club. figure abcd on the coordinate grid below shows the shape of the badge: the badge is enlarged and plotted on the coordinate grid as figure jklm with point j located at (2, -2) and point m is located at (5, 4). which of these could be the coordinates for point l? a. (2, 4) b. (8, 4) c. (5, 1) d. (5, 7)
Answers: 2
image
Mathematics, 22.06.2019 04:20, chrisraptorofficial
What is the range of the inverse of the given function f(x)=√x-2
Answers: 2
image
Mathematics, 22.06.2019 06:00, bubbleslol4463
When you divide a fraction less than 1 by a whole number greater than 1 is the quotient less than, greater than, or equal to the dividend?
Answers: 1
Do you know the correct answer?
Graph. Use linear programming to answer to find the maximum profit. A manufacturer makes snowboards...

Questions in other subjects: