Mathematics
Mathematics, 13.10.2020 15:01, RioQNA

12 labourers can complete a peice of work in 72 days. How many men will be required to do the same work in 54 days?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, corbinfisher
Which statements are true? see picture
Answers: 1
image
Mathematics, 21.06.2019 14:30, ack12
What is the prime factorization of 195
Answers: 2
image
Mathematics, 21.06.2019 18:30, edwinadidas9938
The border line of the linear inequality 4x + 7y < 5 is dotted true or false?
Answers: 2
image
Mathematics, 21.06.2019 19:00, autumn8668
Stefano accidentally dropped his sunglasses off the edge of a canyon as he was looking down. the height, h(t), in meters (as it relates to sea level), of the sunglasses after t seconds, is shown in the table. during its descent, the pair of sunglasses passed by a climber in the canyon 6 seconds after stefano dropped them. to the nearest meter, what is difference in elevation between stefano and the climber? 166 meters 176 meters 230 meters 240 meters its b.176 i took the test 166 is wrong and 176 is correct
Answers: 1
Do you know the correct answer?
12 labourers can complete a peice of work in 72 days. How many men will be required to do the same w...

Questions in other subjects:

Konu
Mathematics, 08.06.2021 07:10
Konu
English, 08.06.2021 07:10