Mathematics
Mathematics, 07.10.2020 16:01, jaquiel3325

The time it takes to wash all the windows on a large building w (2) varies inversely with the number of workers assigned to the job x. It takes 6 hours to complete the job when 4 workers are assigned to it.
Which equation can be used to find the time to complete the job when x workers are assigned to it?
Ow(x) = 1.53
10
Ow(2) =
O w() =
24
Ow(22) = 24.3

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:40, mprjug6
Statement: if two distinct planes intersect, then their intersection is a line. which geometry term does the statement represent? defined term postulate theorem undefined term
Answers: 3
image
Mathematics, 21.06.2019 19:00, jis0
The quadratic function h(t)=-16.1t^2+150 choose the graph representation
Answers: 1
image
Mathematics, 21.06.2019 19:00, kevin2920
Me asap on # : explain how factoring a trinomial, ax^2+ bx+ c, when a does not equal 1 different from factoring a trinomial when a = 1.
Answers: 2
image
Mathematics, 21.06.2019 20:00, cielo2761
The table below represents a linear function f(x) and the equation represents a function g(x): x f(x) −1 −5 0 −1 1 3 g(x) g(x) = 2x − 7 part a: write a sentence to compare the slope of the two functions and show the steps you used to determine the slope of f(x) and g(x). (6 points) part b: which function has a greater y-intercept? justify your answer. (4 points)
Answers: 2
Do you know the correct answer?
The time it takes to wash all the windows on a large building w (2) varies inversely with the number...

Questions in other subjects:

Konu
Mathematics, 25.04.2020 22:08