Mathematics
Mathematics, 06.10.2020 14:01, 24lbriscoe

Your company bids on two contracts. You believe the probability that you get the first contract is 0.75 and if you get the first contract the probability that you also get the second one is 0.4. If you do not get the first contract the probability that you get the second one is 0.45. If you get both contracts the profit will be $75,000 for the company, if you get only one the profit will be $15,000. It costs the company $10,000 per contract to make a bid. What is the expected profit for the company? A) -$20,000
B) $8,187.50
C) $33,687.50
D) $28,187.50

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, sabrinachambers444
2x+3y=12 x-y=6 solve the following system equations
Answers: 1
image
Mathematics, 21.06.2019 14:00, weeblordd
Acompany is testing in comparing to lightbulb designs the box plot shows the number of hours that each lightbulb design last before burning out which statement is best supported by the information of the plot
Answers: 3
image
Mathematics, 21.06.2019 20:30, neariah24
Aswimming pool had 2.5 million liters of water in it. some water evaporated, and then the pool only had 22 million liters of water in it. what percent of the water evaporated?
Answers: 2
image
Mathematics, 22.06.2019 00:30, luis83113
Afarm is to be built in the shape of quadrilateral abcd, as shown below. all four sides are equal. a rhombus abcd is shown with diagonal ac equal to 15.5 feet and diagonal bd equal to 13.2 feet. what is the area of the farm? pleas only pick from the 4 below 62 square feet 52.8 square feet 57.4 square feet 102.3 square feet
Answers: 2
Do you know the correct answer?
Your company bids on two contracts. You believe the probability that you get the first contract is 0...

Questions in other subjects:

Konu
History, 23.01.2020 06:31
Konu
English, 23.01.2020 06:31