Mathematics, 06.10.2020 14:01, 24lbriscoe
Your company bids on two contracts. You believe the probability that you get the first contract is 0.75 and if you get the first contract the probability that you also get the second one is 0.4. If you do not get the first contract the probability that you get the second one is 0.45. If you get both contracts the profit will be $75,000 for the company, if you get only one the profit will be $15,000. It costs the company $10,000 per contract to make a bid. What is the expected profit for the company?
A) -$20,000
B) $8,187.50
C) $33,687.50
D) $28,187.50
Answers: 1
Mathematics, 20.06.2019 18:04, sabrinachambers444
2x+3y=12 x-y=6 solve the following system equations
Answers: 1
Mathematics, 22.06.2019 00:30, luis83113
Afarm is to be built in the shape of quadrilateral abcd, as shown below. all four sides are equal. a rhombus abcd is shown with diagonal ac equal to 15.5 feet and diagonal bd equal to 13.2 feet. what is the area of the farm? pleas only pick from the 4 below 62 square feet 52.8 square feet 57.4 square feet 102.3 square feet
Answers: 2
Your company bids on two contracts. You believe the probability that you get the first contract is 0...
History, 23.01.2020 06:31
English, 23.01.2020 06:31
English, 23.01.2020 06:31
English, 23.01.2020 06:31