A construction company wants to build a 100 meter-high tower as quickly as possible. The company has unlimited resources and an unlimited budget and is willing to spend any amount to get the job done. The tower is to be built with blocks that are 100 meters long and 100 meters wide, but only 1 meter tall. The blocks interlock on top and bottom (like legos). They cannot be stacked sideways. Using lifters, putting one stack on top of another stack takes one week regardless of how high the stacks are. What is the shortest amount of time that it will take to build the tower

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, 7obadiah
What kind of bond pays interest which is exempt from tax?
Answers: 1
image
Mathematics, 21.06.2019 19:00, ggomez4
Rob spent 25%, percent more time on his research project than he had planned. he spent an extra h hours on the project. which of the following expressions could represent the number of hours rob actually spent on the project? two answers
Answers: 3
image
Mathematics, 21.06.2019 23:30, luketrup
Solve this 364x-64x=300x and 12(x2–x–1)+13(x2–x–1)=25(x2–x–1)
Answers: 1
image
Mathematics, 22.06.2019 00:30, danielzgame
Examine this system of equations. what integer should the second equation be multiplied by so that when the two equations are added together, the x term is eliminated? 3/4x+1/7y=6 1/8x-3/5y=16
Answers: 3
Do you know the correct answer?
A construction company wants to build a 100 meter-high tower as quickly as possible. The company has...

Questions in other subjects:

Konu
Mathematics, 07.10.2019 06:00