Mathematics, 19.09.2020 01:01, mhaniyahn
Which table best represents the steps to solve the equation 8 + x over 3 = 4? Step Justification Step 1: x over 3 = 4 + 8 The same number +8 can be added to both sides of the equation Step 2: x over 3 = 12 Adding 8 and 4 on the right hand side Step 3: x = 12 β 3 The same number 3 can be multiplied on both sides of the equation Step 4: x = 36 Multiplying 12 and 3 on the right hand side Step Justification Step 1: x over 3 = 4 β 8 The same number β8 can be added to both sides of the equation Step 2: x over 3 = β4 Adding β8 and 4 on the right hand side Step 3: x = β4 β 3 The same number 3 can be multiplied on both sides of the equation Step 4: x = β12 Multiplying β4 and 3 on the right hand side Step Justification Step 1: x over 3 = 4 β 8 The same number β 8 can be added to both sides of the equation Step 2: x over 3 = β4 Adding 4 and β8 on the right hand side Step 3: x = β 4 β 3 The same number 3 can be subtracted from both sides of the equation Step 4: x = β7 Simplifying β4 β3 Step Justification Step 1: x over 3 = β4 β 8 The same number β8 can be added to both sides of the equation Step 2: x over 3 = β4 Adding β8 and 4 on the right hand side Step 3: x = β4 Γ· 3 The same number 3 can be divided on both sides of the equation Step 4: x = β1.33 Dividing β4 by 3 on the right hand side
Answers: 3
Mathematics, 21.06.2019 17:00, savannahsims4750
If i have a 24 in loaf of bread and i cut it into two pieces one 9 in how long was the other
Answers: 2
Mathematics, 21.06.2019 18:30, Jenniferwolf
Ametal rod needs to be 9 feet and 5.5 inches in length. the sections of the poles being used are each 1 foot and 10.5 inches long. how many 1ft 10.5in sections would be needed to complete the 9ft 5.5in metal rod? and how many inches of material will be left?
Answers: 1
Mathematics, 21.06.2019 19:00, ksiandua07
65% of students in your school participate in at least one after school activity. if there are 980 students in you school, how many do not participate in an after school activity?
Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Which table best represents the steps to solve the equation 8 + x over 3 = 4? Step Justification Ste...
Mathematics, 25.04.2020 21:53
History, 25.04.2020 21:54
English, 25.04.2020 21:54
Mathematics, 25.04.2020 21:54
English, 25.04.2020 21:54
Mathematics, 25.04.2020 21:54