Answers: 3
Mathematics, 22.06.2019 02:40, blake4033
An oil exploration company currently has two active projects, one in asia and the other in europe. let a be the event that the asian project is successful and b be the event that the european project is successful. suppose that a and b are independent events with p(a) = 0.2 and p(b) = 0.8. (a) if the asian project is not successful, what is the probability that the european project is also not successful? (b) what is the probability that at least one of the two projects will be successful? (c) given that at least one of the two projects is successful, what is the probability that only the asian project is successful? (round your answer to three decimal places.)
Answers: 3
Mathematics, 22.06.2019 03:30, milamdaniela
The distance between a football fsaid and a parking lot is 135 feet. what is that length in yards? 2 mickey needs to cut pieces of ribbon that are each 1 meter long to tie onto balloons. if he has 8 pieces of ribbon that are each 1 dekameter long, how many 1-meter pieces of ribbon can he cut? show work
Answers: 1
Mathematics, 22.06.2019 04:00, ciarrap552
Suppose the equation of a line is 2x − 4y = − 8. which coordinate pair represents the y-intercept?
Answers: 2
What is r decreased by 27 is greater than or equal to 37...
Biology, 23.07.2019 03:00
Chemistry, 23.07.2019 03:00
Spanish, 23.07.2019 03:00