Mathematics, 20.08.2020 20:01, dheydar9377
The structural engineering design section within the engineering department of a regional electrical utility corporation has developed several standard designs for a group of similar transmission line towers. The detailed design for each tower is based on one of the standard designs. A transmission line project involving 50 towers has been approved. The estimated number of engineering hours needed to accomplish the 8 th and 50th tower are 108 hours and 94.3 hours respectively. Determine the learning curve percentage and estimate of the number of engineering hours needed to design the 10th tower in the project
Answers: 3
Mathematics, 21.06.2019 17:30, jruiz33106
1mile equals approximately 1.6 kilometers. which best approximates the number of miles in 6 kilometers?
Answers: 1
Mathematics, 21.06.2019 19:00, haileysolis5
Arestaurant chef made 1 1/2 jars of pasta sauce. each serving of pasta requires 1/2 of a jar of sauce. how many servings of pasta will the chef be bale to prepare using the sauce?
Answers: 3
Mathematics, 21.06.2019 20:10, jaidencoolman2866
In the diagram, points d and e are marked by drawing arcs of equal size centered at b such that the arcs intersect ba and bc. then, intersecting arcs of equal size are drawn centered at points d and e. point p is located at the intersection of these arcs. based on this construction, m , and m
Answers: 1
Mathematics, 21.06.2019 23:40, amandaelisantos
In the diagram, a building cast a 35-ft shadow and a flagpole casts an 8-ft shadow. if the the flagpole is 18 ft tall, how tall is the building? round the the nearest tenth.
Answers: 2
The structural engineering design section within the engineering department of a regional electrical...
Health, 11.02.2020 02:22
Mathematics, 11.02.2020 02:22