Mathematics
Mathematics, 16.08.2020 02:01, nunu5671

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 20 child bikes and 6 adult bikes in the week. (2 points) No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:40, pagezbills18
What is the ratio of the change in y-values to the change in x-values for this function? a) 1: 13 b) 2: 5 c) 5: 2 d) 13: 1
Answers: 3
image
Mathematics, 21.06.2019 17:30, margaret1758
Use the distributive law to multiply. 3(4x + 5y + 6)
Answers: 2
image
Mathematics, 21.06.2019 19:00, csnow
Point r divides in the ratio 1 : 3. if the x-coordinate of r is -1 and the x-coordinate of p is -3, what is the x-coordinate of q? a. b. 3 c. 5 d. 6 e. -9
Answers: 1
image
Mathematics, 22.06.2019 00:30, desiree6005
Triangle abc has side lengths: ab = 3.5  cm, bc = 2.4 cm, and ac = 4.2 cmδabc ≅ δhjkwhat is the length of side hj?
Answers: 1
Do you know the correct answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...

Questions in other subjects:

Konu
Mathematics, 24.05.2021 08:10
Konu
Geography, 24.05.2021 08:10