Mathematics
Mathematics, 13.08.2020 14:01, aarieejones

A company manufactures two types of wedding dresses, mermaid and ballroom style for sale. The mermaid makes a profit of N$1000 and ballroom makes a profit of N$850. The manufacture of each of the dresses involves 3 parts, designing, cutting and sewing. The mermaid requires 12hours of designing, 9 hours of cutting and 30 hours of sewing. The ballroom requires 24hours of designing, 5 hours of cutting and 30 hours of sewing. Due to the number of employees available at the company there is at most 480 hour available for designing, 180 hours for cutting and 720 hours for sewing. Assume that the company can sell all the wedding dresses it manufactures, find the maximum number of each type of wedding dress the company should manufacture to maximize profit.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, lzrd3rik
896.31 cm= km 100cm = 1m 1000m = 1km a) 0.0089631 b) 0.0089631 c) 8.9631 d) 89.631
Answers: 2
image
Mathematics, 21.06.2019 18:00, cashhd1212
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at __ , and the third quartile would be drawn at __ link to graph: .
Answers: 1
image
Mathematics, 21.06.2019 18:50, alex7881
In which form is the following function written? y = - 2(x – 3)(x + 5)
Answers: 1
image
Mathematics, 21.06.2019 19:30, viodsenpai
John checked his watch and said that it is thursday, 7 am. what will the day and time be 2006 hours plzzz i will give you 100 points
Answers: 1
Do you know the correct answer?
A company manufactures two types of wedding dresses, mermaid and ballroom style for sale. The mermai...

Questions in other subjects:

Konu
Mathematics, 02.12.2020 19:40
Konu
Mathematics, 02.12.2020 19:40
Konu
Mathematics, 02.12.2020 19:40
Konu
Mathematics, 02.12.2020 19:40