Mathematics
Mathematics, 01.08.2020 19:01, beard6488

A manufacturing company has an old machine which produces 25 components per hour. The company has recently installed a new machine which produces 35 components per hour. Yesterday, both machines were in operation for different periods of time. If 430 components were produced when the total number of hours of operation was 14 hours, determine for how many hours each machine was in operation

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:40, josecano2
Which of the following could be the ratio of the length of the longer leg 30-60-90 triangle to the length of its hypotenuse? check all that apply. a. 313 6 b. 3: 215 c. 18: 13 d. 1: 13 e. 13: 2 of. 3: 15
Answers: 3
image
Mathematics, 21.06.2019 19:50, keigleyhannah30
Use composition to determine if (x) or h(x) is the inverse of f(x) for the limited domain x2-1.
Answers: 3
image
Mathematics, 21.06.2019 21:30, BreBreDoeCCx
Find the missing dimension extra points
Answers: 2
image
Mathematics, 22.06.2019 00:30, jacks0292
For the sequence [tex]a_{n} = 2n/(n+1)[/tex], what is the value of [tex]a_{10}[/tex]
Answers: 2
Do you know the correct answer?
A manufacturing company has an old machine which produces 25 components per hour. The company has re...

Questions in other subjects:

Konu
Mathematics, 26.08.2021 21:20
Konu
Social Studies, 26.08.2021 21:20