Mathematics
Mathematics, 23.07.2020 01:01, claudiniweenie

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 20 child bikes and 6 adult bikes in the week. (2 points) Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, 20calzoy
Arestaurant chef made 1 1/2 jars of pasta sauce. each serving of pasta requires 1/2 of a jar of sauce. how many servings of pasta will the chef be able to prepare using the sauce?
Answers: 1
image
Mathematics, 21.06.2019 20:00, rina62
The diagram shows corresponding lengths in two similar figures. find the area of the smaller figure. a. 14.4 yd2 b. 24 yd2 c. 26.4 yd2 d. 28
Answers: 1
image
Mathematics, 21.06.2019 23:30, jtroutt74
Afactory buys 10% of its components from suppliers b and the rest from supplier c. it is known that 6% of the components it buys are faulty. of the components brought from suppliers a,9% are faulty and of the components bought from suppliers b, 3% are faulty. find the percentage of components bought from supplier c that are faulty.
Answers: 1
image
Mathematics, 22.06.2019 00:10, angelteddy033
Use your knowledge of the binary number system to write each binary number as a decimal number. a) 1001 base 2= base 10 b) 1101 base 2 = base 10
Answers: 1
Do you know the correct answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...

Questions in other subjects:

Konu
Mathematics, 05.02.2021 05:10
Konu
Mathematics, 05.02.2021 05:10