There are two phases in completing a construction project. The mean time taken to complete Phase I is 16 months, with a standard deviation of 4 months. The mean time taken to complete Phase II is 12 months, with a standard deviation of 3 months. The correlation between the time taken to complete Phase I and Phase II is -0.6, because if Phase I takes a longer time to complete, the construction company tries to rush through Phase II. What is the standard deviation for the total time taken to complete both phases of the project?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, Maaarii
Fanny mendelssohn manages all the magazines and paperback books at a local grocery store. she prices many paperbacks to sell at $7.99. the cost to the store is $5.29. what is the markup rate on a paperback book, based on its cost?
Answers: 1
image
Mathematics, 21.06.2019 18:00, amw4
What is the relationship between all triangles that can be drawn given the same three angles
Answers: 2
image
Mathematics, 21.06.2019 19:30, bree480
Aline passes through 3,7 and 6,9 what equation represents the line
Answers: 2
image
Mathematics, 21.06.2019 21:30, errr5529
On traditional maps, earth is represented in a flat plane, or by euclidean geometry. however, a globe is a more accurate model that comes from elliptical geometry. how does a globe represent the fact that there are no parallel lines in elliptical geometry? the equator is not parallel to any other latitudinal lines. the north and south poles are never connected by a geodesic. the geodesics connecting the north and south poles never intersect. the geodesics connecting the north and south poles intersect at both of the poles.