Mathematics
Mathematics, 27.06.2020 07:01, kemzzoo9338

A heavy rope, 30 ft long, weighs 0.4 lb/ft and hangs over the edge of a building 80 ft high. Approximate the required work by a Riemann sum, then express the work as an integral and evaluate it. How much work W is done in pulling half the rope to the top of the building

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, heatherswiffin666
Rewrite the following without an exponent. (5/8)-1
Answers: 1
image
Mathematics, 21.06.2019 15:00, gghkooo1987
This is the number of parts out of 100, the numerator of a fraction where the denominator is 100. submit
Answers: 3
image
Mathematics, 21.06.2019 16:00, michellealvarez985
Quadrilateral wxyz is on a coordinate plane. segment yz is on the line x+y=7 and segment xw is on the line x+y=3. which statement proves how segments yz and xw are related
Answers: 1
image
Mathematics, 21.06.2019 17:00, oscarmendoza2107
Let f(x)=2x and g(x)=2x. graph the functions on the same coordinate plane. what are the solutions to the equation f(x)=g(x) ?me asap
Answers: 2
Do you know the correct answer?
A heavy rope, 30 ft long, weighs 0.4 lb/ft and hangs over the edge of a building 80 ft high. Approxi...

Questions in other subjects:

Konu
Mathematics, 24.04.2020 20:08