Mathematics, 16.06.2020 22:57, taylorb9893
When estimating a job to bid, a contractor’s estimator first determines the actual cost of labor using the function
L(h) = 28.75h, where h is the number of estimated hours it will take to complete the job. Next, the estimator adds the labor burden, which accounts for taxes and insurance, using the function B(L) = 1.78L. Finally, the estimator calculates the selling price, including the markup for overhead and profit, using the function M(B) = 1.43B.
Which composite function can be used to find the selling price for the labor portion of a bid based on the estimated number of hours?
M(B(h)) = 73.18025h
M(B(h)) = 51.175h
M(B(h)) = 31.96h
M(B(h)) = 30.53h
Answers: 3
Mathematics, 21.06.2019 19:10, dylancasebere
What is the quotient of m^6/5 Ă· 5/m^2? assume m does not equal pl
Answers: 1
Mathematics, 21.06.2019 20:00, bermudezs732
Graph the linear function using the slooe and y intercept
Answers: 2
Mathematics, 21.06.2019 20:30, gsmgojgoss9651
Cody was 165cm tall on the first day of school this year, which was 10% taller than he was on the first day of school last year.
Answers: 1
When estimating a job to bid, a contractor’s estimator first determines the actual cost of labor usi...
Mathematics, 23.02.2020 02:58
Mathematics, 23.02.2020 02:58
Mathematics, 23.02.2020 02:59
Biology, 23.02.2020 02:59