Mathematics
Mathematics, 07.06.2020 01:58, Briannadavis03

A project team assesses their primary risk factor's probability of failure with a maturity risk of 0.3, a complexity risk of 0.7, and a dependency risk of 0.8. The probability of failure is: a. Greater than 0.3 but less than or equal to 0.55.
b. Greater than or equal to 0.9.
c. Greater than 0.56 but less than or equal to 0.89.
d. Less than or equal to 0.3.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, vanessadaniellet21
Analyze the data sets below. data set a 25,25,25,26,26,26,27,28,28,29,30,31 ,31,32,33,33,34,35,35,35 data set b 25,25,25,26,26,26,26,27,27,27,27,28 ,28,29,29,30,31,31,32,34 which of the following statement are true? select all that apply. a. data set a is relatively symmetric and data set b is skewed left. b. the means of the data sets are within 3 units from eachother. c. the data sets have the same standard deviation. d. the mean of data set a is 27.95 and the mean of data set b is 30. e. the data set b has a higher standard deviation than data set a. f. the mean and median of data set a are close in value.
Answers: 3
image
Mathematics, 21.06.2019 15:00, NicoleQuinn
Find the sum of the measure of the interior angles of a polygon of 9 sides ; of 32 sides
Answers: 1
image
Mathematics, 21.06.2019 15:00, jonesromari
What are the constants in this expression? -10.6+9/10+2/5m-2.4n+3m
Answers: 3
image
Mathematics, 21.06.2019 16:30, enchantednights
Look at attachment. has all info needed. need
Answers: 1
Do you know the correct answer?
A project team assesses their primary risk factor's probability of failure with a maturity risk of 0...

Questions in other subjects:

Konu
Mathematics, 07.04.2020 00:30
Konu
Mathematics, 07.04.2020 00:30