Mathematics
Mathematics, 28.05.2020 05:00, airiyannag0113

Company ABC has one thermostat, two boilers, and one water gauge. For a company to be properly heated, the thermostat and a minimum of one boiler must be operational (both boilers can also be operational). The water gauge is not a factor. History shows that each boiler is operational 72% of the time. The thermostat is operational 94% of the time and the water gauge is operational 87% of the time. Failures of either the thermostat, boilers or water gauge are independent of each other. What is the probability that company ABC is properly heated.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, love123jones
Una caja de galletas contiene 16 paquetes y cada una de estas tiene 12 galletas y se quieren repartir entre 6 niños ¿de cuantas galletas le toca a cada niño?
Answers: 1
image
Mathematics, 21.06.2019 23:00, utjfkdndidndldn62121
Why is it so easy to buy on impulse and overspend with a credit card? what could you do to counteract this tendency?
Answers: 1
image
Mathematics, 21.06.2019 23:30, yaretxi
If you measured the width of a window in inches and then in feet with measurement would you have the greater number of units
Answers: 3
image
Mathematics, 22.06.2019 01:20, emanuel323
Use pascal's triangle to find the missing values. x4 - 4xb + 6x2 - ax + 1
Answers: 3
Do you know the correct answer?
Company ABC has one thermostat, two boilers, and one water gauge. For a company to be properly heate...

Questions in other subjects:

Konu
Mathematics, 05.05.2020 05:56
Konu
Chemistry, 05.05.2020 05:56