Mathematics
Mathematics, 26.05.2020 00:57, vinnie48

The variable costs associated with a certain process are GHS0.65 per item. The fixed costs per day have been calculated as GHS250 with special costs estimated as GHS0.02, where Q is the output level produced ( i, e, the number of items produced ).
a. Derive the average cost of production function
b. Calculate the output level at which average cost is minimised
c. Calculate the average cost of production
d. What limitation is placed on Q?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, BreBreDoeCCx
If the class was going to get a class pet and 5 picked fish and 7 pick bird and 8 picked rabbits have many students were in the
Answers: 1
image
Mathematics, 21.06.2019 18:50, casianogabriel2004
Which expression shows the sum of the polynomials with like terms grouped together
Answers: 2
image
Mathematics, 21.06.2019 20:00, lorip7799ov3qr0
The total number of dental clinics total for the last 12 months was recorded
Answers: 3
image
Mathematics, 21.06.2019 20:10, kendall984
Right triangle xyz has a right angle at vertex y and a hypotenuse that measures 24 cm. angle zxy measures 70ΒΊ. what is the length of line segment xy? round to the nearest tenth. 8.2 cm 8.7 cm 22.6 m 25.5 cm
Answers: 1
Do you know the correct answer?
The variable costs associated with a certain process are GHS0.65 per item. The fixed costs per day h...

Questions in other subjects: