Mathematics
Mathematics, 24.05.2020 01:58, 60744

Sporting Equipment, Inc. makes two types of balls: Soccer balls and Cork balls. The making of each soccer ball and cork ball requires 3 hours and 4 hours of production time, respectively. A total of 500 production hours are available during the next month At least 150 balls, combined, must be produced. The production cost for each Soccer ball is $9 and each Cork ball is $7.Formulate and solve a linear programming model minimizing production costs.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:20, lpssprinklezlps
Consider the proof. given: segment ab is parallel to line de. prove: what is the missing statement in step 5?
Answers: 3
image
Mathematics, 22.06.2019 00:30, krojas015
The power generated by an electrical circuit (in watts) as a function of its current c (in amperes) is modeled by p(c)= -15c(c-8) what current will produce the maximum power?
Answers: 1
image
Mathematics, 22.06.2019 02:00, amberwilliams22
The table shows values for functions f(x) and g(x) . x f(x)=βˆ’4xβˆ’3 g(x)=βˆ’3x+1+2 βˆ’3 9 179 βˆ’2 5 53 βˆ’1 1 1 0 βˆ’3 βˆ’1 1 βˆ’7 βˆ’7 2 βˆ’11 βˆ’25 3 βˆ’15 βˆ’79 what is the solution to f(x)=g(x) ? select each correct answer.
Answers: 1
image
Mathematics, 22.06.2019 03:00, pilarmonsivais
Anew obstacle course is home to several new types of challenging obstacles. one such obstacle is traversing a 15-stair staircase. to make it more challenging, the stairs are not uniformly spaced. rather, the vertical space between consecutive stairs for the first 10 stairs is 113 feet and the vertical space for the last 5 stairs is 134 feet. what is the total vertical distance traveled ascending and descending the entire 15-stair staircase?
Answers: 3
Do you know the correct answer?
Sporting Equipment, Inc. makes two types of balls: Soccer balls and Cork balls. The making of each s...

Questions in other subjects:

Konu
German, 13.02.2021 22:40
Konu
Mathematics, 13.02.2021 22:40