Mathematics, 23.05.2020 07:02, Lydiac9243
A coffee manufacturing company has two different plants that roast imported coffee beans. After roasting, the plants produce three types of coffee beans, A, B, and C. The company has contracted with a chain of cafes to provide per week, 20 tons of coffee bean A, 11 tons of coffee bean B, and 18 tons of coffee bean C.
The two plants have the same capacity, but diverse operational features as below:
Manufacturing Cost per Ton ($)
Plant A B C Capacity
P1 900 1125 875 25
P2 850 1200 950 25
Demand 20 11 18
Formulate and solve all-integer model that will determine how many tons of each type of coffee beans are produced in each plant by minimizing the total cost.
Answers: 3
Mathematics, 20.06.2019 18:02, brandonleestewovilgw
Abanner is made of a square and a semicircle. the square has side lengths of 24 inches. one side of the square is also the diameter of the semicircle. what is the total area of the banner? use 3.14 for π.
Answers: 2
Mathematics, 21.06.2019 16:30, tamya12234
If 10 men take 18 days to mow 60 acres of grass, how long will 15 men take to mow 80 acres?
Answers: 3
A coffee manufacturing company has two different plants that roast imported coffee beans. After roas...
English, 14.04.2020 18:33
Mathematics, 14.04.2020 18:33
Chemistry, 14.04.2020 18:33
Mathematics, 14.04.2020 18:33