Mathematics
Mathematics, 21.05.2020 21:04, jewlbug4358

The overall project risk factor is known to be 0.5. The probability of dependency failure is twice the probability of complexity failure and four times the probability of maturity failure. The consequence of performance failure is twice the consequence of reliability failure, four times the consequence of schedule failure and eight times the consequence of cost failure. What is the difference between the probability of maturity failure and the consequence of cost failure

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, jessica01479
Scale factor of 2 is used to enlarge a figure as shown below the area of is 18 in.²
Answers: 3
image
Mathematics, 21.06.2019 23:00, BaileyElizabethRay
Find the distance between c and d on the number line c=3 and d=11
Answers: 1
image
Mathematics, 22.06.2019 01:00, rexerlkman4145
Mia’s gross pay is 2953 her deductions total 724.15 what percent if her gross pay is take-home pay
Answers: 2
image
Mathematics, 22.06.2019 02:00, hibbo579
Currently, the largest cruise ship has a tonnage of 225,282 gross tons (gt). which of the following is a reasonable estimate for the tonnage of this cruise ship? a. 2 × 10^5 gt b. 2 × 10^6 gt c. 2 × 10^-5 gt d. 2 × 10^-6 gt
Answers: 1
Do you know the correct answer?
The overall project risk factor is known to be 0.5. The probability of dependency failure is twice t...

Questions in other subjects:

Konu
English, 15.04.2021 03:00
Konu
Mathematics, 15.04.2021 03:00
Konu
Mathematics, 15.04.2021 03:00
Konu
Mathematics, 15.04.2021 03:00