Mathematics
Mathematics, 21.05.2020 02:01, livmoney8905

The maintenance manager at a trucking company wants to build a regression model to forecast the time until the first engine overhaul based on four explanatory variables: (1) annual miles driven, (2) average load weight, (3) average driving speed, and (4) oil change interval. Based on driver logs and onboard computers, data have been obtained for a sample of 25 trucks. Time Until First Engine Overhaul (Yrs) Annual Miles Driven (000) Average Load Weight (tons) Average Driving Speed (mph) Oil Change Interval (000 miles)7.9 42.8 19 46 150.9 98.5 25 46 298.5 43.4 21 64 141.3 110.7 27 60 261.4 102.3 28 51 172.1 97.1 24 63 202.5 92.8 23 55 157.4 53.9 20 65 138.2 51.4 22 52 174.1 84.9 25 56 280.5 120.4 29 52 235.1 77.5 25 48 275.2 68.6 21 48 255.3 54.9 24 58 235.7 66.7 20 58 268.5 39.4 20 50 165.8 52.7 21 56 255.9 54.2 19 48 174.4 74.8 22 65 256.3 58.7 20 54 166.7 52.3 22 53 197.0 68.6 18 51 193.9 94.6 23 54 237.2 45.7 17 58 156.1 61.2 24 58 19
a. Estimate the regression model to predict the time before the first engine overhaul for a truck driven 60,000 miles per year with an average load of 22 tons, an average driving speed of 57 mph, and 18,000 miles between oil changes. (Note that both annual miles driven and oil change interval are measured in 1,000s.)b. Use the above prediction to calculate and interpret the 90% confidence interval for the mean time before the first engine overhaul. c. Calculate and interpret the corresponding 90% prediction interval for the time before the first

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, kellynadine02
Evaluate the expression. (9 + 5)(3 + 2)0
Answers: 2
image
Mathematics, 21.06.2019 20:00, sum72
Triangle knm is what is true about the sides of knm
Answers: 3
image
Mathematics, 21.06.2019 21:00, mayavue99251
If 30 lb of rice and 30 lb of potatoes cost ? $27.60? , and 20 lb of rice and 12 lb of potatoes cost ? $15.04? , how much will 10 lb of rice and 50 lb of potatoes? cost?
Answers: 1
image
Mathematics, 21.06.2019 22:00, bay97
Type the correct answer in each box. spell all the words correctly, and use numerals instead of words for numbers. if necessary, use / for the fraction bar(s).
Answers: 1
Do you know the correct answer?
The maintenance manager at a trucking company wants to build a regression model to forecast the time...

Questions in other subjects:

Konu
Chemistry, 28.01.2020 05:31
Konu
Mathematics, 28.01.2020 05:31