Mathematics
Mathematics, 06.05.2020 03:46, lakiethalucas

An entrepreneur is having a design group produce at least eight samples of a new kind of fastener that he wants to market. It costs $6.00 to produce each metal fastener and $10.00 to produce each plastic fastener. He wants to have at least two of each version of the fastener and needs to have all the samples 58 hours from now. It takes 5 hours to produce each metal sample and 4 hours to produce each plastic sample. To minimize the cost of the samples, how many of each kind should the entrepreneur order? What will be the cost of the samples? To minimize the cost of the samples, how many of each type of sample should the entrepreneur order? The entrepreneur should order ___ metal samples and ___ plastic samples.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, aero8030
Which value of c would make he following expression completely factored? 8x+cy
Answers: 1
image
Mathematics, 21.06.2019 22:30, ari9425
An ant travels at a constant rate of 30cm every 2 minutes. at what speed does the ant travel per minute
Answers: 2
image
Mathematics, 21.06.2019 22:30, hasshh
The dash figure is a dilation if the original figure. find the scale factor. classify the dilation as an enlargement or a reduction
Answers: 2
image
Mathematics, 21.06.2019 22:40, 721345
What is the the greatest common factor ?
Answers: 2
Do you know the correct answer?
An entrepreneur is having a design group produce at least eight samples of a new kind of fastener th...

Questions in other subjects:

Konu
Mathematics, 17.03.2021 23:40
Konu
Mathematics, 17.03.2021 23:40
Konu
Business, 17.03.2021 23:40