Mathematics
Mathematics, 05.05.2020 19:33, opreston

A quality control engineer at a potato chip company tests the bag filling machine by weighing bags of potato chips. Not every bag contains exactly the same weight. But if more than 15% of bags are over-filled then they stop production to fix the machine. They define over-filled to be more than 1 ounce above the weight on the package. The engineer weighs 100 bags and finds that 21 of them are over-filled. He plans to test the hypotheses H 0: p = 0.15 versus H a : p > 0.15. What is the test statistic?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, hollis79
Find the balance at the end of 4 years if 1000 is deposited at the rate of
Answers: 1
image
Mathematics, 21.06.2019 18:00, ineedhelp2285
How to do this , and can some one explain
Answers: 1
image
Mathematics, 21.06.2019 19:30, danielahalesp87vj0
Can someone me with these two circle theorem questions asap?
Answers: 2
image
Mathematics, 21.06.2019 23:00, BaileyElizabethRay
Find the distance between c and d on the number line c=3 and d=11
Answers: 1
Do you know the correct answer?
A quality control engineer at a potato chip company tests the bag filling machine by weighing bags o...

Questions in other subjects:

Konu
Physics, 06.10.2020 15:01
Konu
Biology, 06.10.2020 15:01