Mathematics
Mathematics, 05.05.2020 17:39, bcarri4073

An assembled product is built by 10 worker who coordinate their task. A total of 100 units will be made. Time records indicate that the 10 workers took a total of 95 hrs. (unit time) to complete the first unit of the product. Times to complete the second and third units of work are not available; however, the fourth work unit took 71 hr. to complete. Determine (a) the learning rate percentage and (b) the most likely times required to complete the second and third units. (c) If the learning rate continues, how long will it take to complete the 100th unit

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:00, stalley1521
How many solutions does the nonlinear system of equations graphed below have? a. one b. zero c. four d. two
Answers: 2
image
Mathematics, 21.06.2019 23:30, weirdojuwin
In an isosceles triangle, the vertex angle is 112 degrees. what is the measure of each base. a.34 b.24 c.44 d.54
Answers: 1
image
Mathematics, 22.06.2019 01:30, destiny2521
What is the domain of the of the exponential function shown below?
Answers: 2
image
Mathematics, 22.06.2019 01:30, wendelljo61
David is standing on the sixth rung of a ladder while painting his house. which expressions represent a change in david’s position of 2 rungs on the ladder? choose exactly two answers that are correct. a. 6+2 b. 6-2 c. 2x6 d. 6/2
Answers: 1
Do you know the correct answer?
An assembled product is built by 10 worker who coordinate their task. A total of 100 units will be m...

Questions in other subjects:

Konu
Mathematics, 12.12.2019 20:31