A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly takes 45 min (unit time). The worker produces 10 welded assemblies on the second day, and the 10th assembly on the second day takes 30 min. Given this information, (a) what is the learning rate percentage and (b) what is the total cumulative time to produce all 17 welded assemblies

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:00, anastasiakonni1
Jayne is studying urban planning and finds that her town is decreasing in population by 3% each year. the population of her town is changing by a constant rate. true or false?
Answers: 3
image
Mathematics, 21.06.2019 22:50, kaylarojascliff
On the first of each month sasha runs a 5k race she keeps track of her times to track her progress her time in minutes is recorded in the table
Answers: 1
image
Mathematics, 21.06.2019 23:30, yaretxi
If you measured the width of a window in inches and then in feet with measurement would you have the greater number of units
Answers: 3
image
Mathematics, 22.06.2019 02:00, amberskids2
Consider the linear function that is represented by the equation y= 4x+5
Answers: 1
Do you know the correct answer?
A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly ta...

Questions in other subjects: