Because of variability in the manufacturing process, the actual yielding point of a sample of mild steel subjected to increasing stress will usually differ from the theoretical yielding point. Let p denote the true proportion of samples that yield before their theoretical yielding point. If on the basis of a sample it can be concluded that more than 20% of all specimens yield before the theoretical point, the production process will have to be modified.

If 15 of 60 specimens yield before the theoretical point what is the P-value when the appropriate test is used, and what would you advise the company to do?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, nique1024
In trapezoid efgh, m∠hef=(4x2+16)∘ and m∠gfe=(5x2+12)∘. find the value of x so that efgh is isosceles.
Answers: 1
image
Mathematics, 21.06.2019 20:30, alex7881
Which of the following best describes the figure?
Answers: 1
image
Mathematics, 21.06.2019 22:30, abigail251
The given diagram shows the parts of a right triangle with an altitude to the hypotenuse. using the two given  measures, find the other four.
Answers: 1
image
Mathematics, 21.06.2019 23:00, Pingkay7111
Which geometric principle is used to justify the construction below?
Answers: 1
Do you know the correct answer?
Because of variability in the manufacturing process, the actual yielding point of a sample of mild s...

Questions in other subjects:

Konu
Mathematics, 12.12.2020 16:00
Konu
Mathematics, 12.12.2020 16:00
Konu
Mathematics, 12.12.2020 16:00