Mathematics
Mathematics, 24.04.2020 21:38, alizeleach0123

A furniture company has two plants that produce the lumber used in manufacturing tables and chairs. In 1 day of operation, plant A can produce the lumber required to manufacture 30 tables and 40 chairs, and plant B can produce the lumber to manufacture 25 tables and 50 chairs. The company needs enough lumber to manufacture at least 300 tables and 500 chairs. If it costs $1,000 to operate plant A for 1 day, and $800 to manufacture plant B for one day, how many days should each plant be operated to produce the sufficient amount of lumber at minimum cost

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:10, krystalhurst97
What is the distance between the points (2, 5) and (5,9)?
Answers: 1
image
Mathematics, 21.06.2019 23:30, niquermonroeee
Abaseball team drinks 10/4 gallons of water during a game. which mixed number represents the gallons of water consumed? a) 1 1/2 gallons b) 2 1/2 gallons c) 2 3/4 gallons d) 3 1/2 gallons
Answers: 2
image
Mathematics, 22.06.2019 01:50, savannahwatson620102
Find the area between y=e^x and y=e^2x over [0,1]
Answers: 1
image
Mathematics, 22.06.2019 03:30, Tf0273433
3a + 5b - 7 = 0 a - 2b - 4 = 0 solve the system by the elimination method. check your work {(96/11, -5/11)} {(34/11, -5/11)} {(32/33, 5/11)}
Answers: 1
Do you know the correct answer?
A furniture company has two plants that produce the lumber used in manufacturing tables and chairs....

Questions in other subjects:

Konu
Engineering, 10.09.2021 01:00
Konu
English, 10.09.2021 01:00
Konu
Social Studies, 10.09.2021 01:00
Konu
Mathematics, 10.09.2021 01:00