Mathematics
Mathematics, 23.04.2020 05:58, vdirectioner7634

Molly works for a meat producer, and she needs to determine whether containers of ground beef have the correct fat content. She obtains a random sample of 120 containers of ground beef and finds that 84 percent have the correct fat content. Molly then conducts a hypothesis test of H0:p=0.80 versus Ha:p≠0.80 and calculates a test statistic of 1.10 with a p-value of 0.273. Which of the following best represents the meaning of the p-value?

A: If the population proportion is 0.84, the probability of observing a sample proportion of 0.80 is 0.273.
B: If the population proportion is 0.84, the probability of observing a sample proportion of at least 0.04 less than 0.84 is 0.273.
C: If the population proportion is 0.80, the probability of observing a sample proportion within 0.04 of 0.80 is 0.273.
D: If the population proportion is 0.80, the probability of observing a sample proportion at least 0.04 greater than 0.80 is 0.273.
E: If the population proportion is 0.80, the probability of observing a sample proportion of at least 0.84 or at most 0.76 is 0.273.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, doodles51
How is the number of vertices for a prism related to the name of the prism
Answers: 1
image
Mathematics, 21.06.2019 18:00, bravomichelle75
Aschool puts on a play. the play costs $1,200 in expenses. the students charge $4.00 for tickets. there will be one performance of the play in an auditorium that seats 500 people. what is the domain of the function that shows the profit as a function of the number of tickets sold?  
Answers: 2
image
Mathematics, 21.06.2019 19:00, cassie2021
What are the solutions of the equation? 5z^2 + 9z - 2 = 0 a. 1, -2 b. 1, 2 c. 1/5, -2 d. 1/5, 2
Answers: 2
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Do you know the correct answer?
Molly works for a meat producer, and she needs to determine whether containers of ground beef have t...

Questions in other subjects: