Mathematics
Mathematics, 18.04.2020 21:22, albattatasraap5wymy

One conveyor belt can move 1000 boxes in 9 minutes. Another can move 1000 boxes in 11 minutes. If another conveyor belt is added and all three are used, the boxes are moved in 3 minutes. How long would it take the third conveyor belt alone to do the same job?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:40, shikiaanthony
You have 3 boxes, one "strawberries"; one "mentos" and one "mixed".but you know that all the labels are in incorrect order .how do you know witch is witch?
Answers: 1
image
Mathematics, 21.06.2019 21:00, kharmaculpepper
Joanie watched 1 out of three of a movie in the morning
Answers: 1
image
Mathematics, 21.06.2019 22:40, michaellagann2020
Adeli owner keeps track of the to-go orders each day. the results from last saturday are shown in the given two-way frequency table. saturday's to-go deli orders in person by phone online total pick up 38 25 31 94 delivery 35 28 34 97 total 73 53 65 191 what percent of the to-go orders were delivery orders placed by phone? a. 14.66% b. 38.41% c. 28.87% d. 52.83%
Answers: 2
image
Mathematics, 22.06.2019 00:30, ianim207
If the perimeter of the square equals the perimeter of the regular pentagon. each side of a pentagon is 16cm long. how long is each side of the square?
Answers: 3
Do you know the correct answer?
One conveyor belt can move 1000 boxes in 9 minutes. Another can move 1000 boxes in 11 minutes. If an...

Questions in other subjects:

Konu
Spanish, 27.08.2021 17:30