Mathematics
Mathematics, 18.04.2020 02:45, xXCoryxKenshinXx

Amy can get a job done alone in 12 hours; Tom can get the same job done in 15 hours alone. How long will it take if both Amy and Tom work together to get the job done?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, riptaylorsreputation
7x+8y=-18, 4x-9y=-3 solve the system of equations
Answers: 3
image
Mathematics, 21.06.2019 19:10, brownzackery71
Girardo is using the model below to solve the equation . girardo uses the following steps: step 1 add 4 negative x-tiles to both sides step 2 add 1 negative unit tile to both sides step 3 the solution is which step could be adjusted so that gerardo's final step results in a positive x-value? in step 1, he should have added 4 positive x-tiles to both sides. in step 1, he should have added 3 negative x-tiles to both sides. in step 2, he should have added 4 negative unit tiles to both sides. in step 2, he should have added 1 positive unit tile to both sides.
Answers: 2
image
Mathematics, 21.06.2019 20:00, ElizabethF
Aball is dropped from a height of 10m above the ground. it bounce to 90% of its previous height on each bounce. what is the approximate height that the ball bounce to the fourth bounce?
Answers: 2
image
Mathematics, 21.06.2019 20:30, cgarnett5408
Find the magnitude, correct to two decimal places, made by each of the following with positive direction of the x axis a) y= x the answer is 45° but i don’t know how
Answers: 2
Do you know the correct answer?
Amy can get a job done alone in 12 hours; Tom can get the same job done in 15 hours alone. How long...

Questions in other subjects:

Konu
Physics, 19.09.2021 01:40