Mathematics
Mathematics, 17.04.2020 18:17, rathaditi4036

The article"Modeling Arterial Signal Optimization with Enhanced Cell Transmission Formulations" (Z. Li, Journal of Transportation Engineering 2011:445 – 454) presents a new method for timing traffic signals in heavily traveled intersections. The effectiveness of the new method was evaluated in a simulation study. In 50 simulations, the mean improvement in traffic flow in a particular intersection was 654.1 vehicles per hour, with a standard deviation of 311.7 vehicles per hour. a) Find a 95% confidence interval for the improvement in traffic flow due to the new system. b) Find a 98% confidence interval for the improvement in traffic flow due to the new system. c) A traffic engineer states that the mean improvement is between 581.6 and 726.6 vehicles per hour. With what level of confidence can this statement be made?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, ellemarshall13
15 there is a line that includes the point 0,10 and has a slope of 7/4. what is it’s equation in slope intercept form
Answers: 1
image
Mathematics, 21.06.2019 21:00, Parmenter
Tim open up a new saving account with a $50 deposit and plant to deposit $20 per week into the same account. write an expression to represent the total amount in his savings account.
Answers: 1
image
Mathematics, 21.06.2019 21:00, tttyson
God's gym charges a sign-up fee of $100 plus $30 per month. write an expression to represent how much someone would pay for a membership.
Answers: 1
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Do you know the correct answer?
The article"Modeling Arterial Signal Optimization with Enhanced Cell Transmission Formulations" (Z....

Questions in other subjects:

Konu
English, 24.03.2021 23:40
Konu
Mathematics, 24.03.2021 23:40
Konu
Mathematics, 24.03.2021 23:40