Mathematics
Mathematics, 15.04.2020 03:03, oryunnis

If the project is finished within 26 weeks of its start, the project manager will receive a bonus of $1,000; and if the project is finished within 27 weeks of its start, the bonus will be $500. Find the probability of each bonus. (Round Mean, Standard Deviation, z-value to 2 decimal places and Probability to 4 decimal places.) Path Mean Std. Dev. a-d-e-h 24.33 1.35 a-f-g 15.50 1.26 b-i-j-k 14.83 1.02 c-m-n-o 26.17 1.66 Probability ($1,000) .4099 Probability ($500)

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:10, sujeyribetanco2216
The average number of vehicles waiting in line to enter a parking lot can be modeled by the function f left parenthesis x right x squared over 2 left parenthesis 1 minus x right parenthesis endfraction , where x is a number between 0 and 1 known as the traffic intensity. find the rate of change of the number of vehicles waiting with respect to the traffic intensity for the intensities (a) xequals0.3 and (b) xequals0.6.
Answers: 1
image
Mathematics, 21.06.2019 17:30, hughesbella
40 describe the outliers from the scatter plot.
Answers: 1
image
Mathematics, 21.06.2019 18:30, 60129
True or false? a circle could be circumscribed about the quadrilateral below.
Answers: 3
image
Mathematics, 22.06.2019 01:00, jazzytazzyyy
Use mathematical induction to prove the statement is true for all positive integers n, or show why it is false. 1^2 + 4^2 + 7^2 + + (3n - 2)^2 = [n(6n^2-3n-1)/2]
Answers: 1
Do you know the correct answer?
If the project is finished within 26 weeks of its start, the project manager will receive a bonus of...

Questions in other subjects: