Mathematics
Mathematics, 14.04.2020 21:20, solomander4

A large manufacturing plant has analyzed the amount of time required to produce an electrical part and determined that the times follow a normal distribution with mean time μ = 45 hours. The production manager has developed a new procedure for producing the part. He believes that the new procedure will decrease the population mean amount of time required to produce the part. After training a group of production line workers, a random sample of 25 parts will be selected and the average amount of time required to produce them will be determined. If the switch is made to the new procedure, the cost to implement the new procedure will be more than offset by the savings in manpower required to produce the parts. Use the hypothesis: H0: μ ≥ 45 hours and Ha: μ < 45 hours. If the sample mean amount of time is = 43.118 hours with the sample standard deviation s = 5.5 hours, give the appropriate conclusion, for α = 0.025.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:50, danielzgame
The verbal translation for the difference of m and 7 increased by 15
Answers: 3
image
Mathematics, 22.06.2019 00:00, joe1591
Which of the following are arithmetic sequences? check all that apply. a. 0.3, 0.6, 0.9, 1.2, 1.5, b. 2, 3, 6, 11, 18, c. 150, 147, 144, 142, d. 2, 4, 9, 16, 25,
Answers: 1
image
Mathematics, 22.06.2019 00:40, townselt3861
‼️‼️‼️‼️‼️the pressure exerted on the walls of a container by a gas enclosed within it is directly proportional to the temperature of the gas. if the pressure is 6 pounds per square inch when the temperature is 440 f, find the pressure exerted when the temperature of the gas is 380°f. (show work)
Answers: 1
image
Mathematics, 22.06.2019 02:00, Affousietta
Hurry!me out! m c 8 10 12 gracie's art box has 5 less crayons, c, than three times the number of markers, m. function: c = 3m - 5 complete the table to show how the number of crayons depends on the number of markers. enter answers in order from top to bottom.
Answers: 2
Do you know the correct answer?
A large manufacturing plant has analyzed the amount of time required to produce an electrical part a...

Questions in other subjects: