Mathematics, 10.04.2020 04:56, Ashu638
A company produces two types of bicycles; mountain bikes and racing bikes. It takes 7 hours of assembly time and 9⁄2 hours of mechanical tuning time to produce a mountain bike. It takes 10 hours of assembly time and11/2 hours of mechanical tuning time to produce a racing bike. The company has at most 24 hours of mechanical tuning labor per week and at most 161 hours of assembly labor per week. The company's profit is $50 for each mountain bike produced and $200 for each racing bike produced. The company wants to make as much money as possible. Let x = the number of mountain bikes they produce, and let y = the number of racing bikes they produce. Which of the following is the objective function for the problem?
a) Maximize P = 200x + 50y
b) Minimize P = 200x + 50y
c) Maximize P = 10000xy
d) Minimize P = 50x + 200y
e) Maximize P = 50x + 200y
f) None of the above.
Answers: 2
Mathematics, 21.06.2019 18:00, briseidam6683
Suppose sat writing scores are normally distributed with a mean of 497 and a standard deviation of 109. a university plans to award scholarships to students whose scores are in the top 2%. what is the minimum score required for the scholarship? round your answer to the nearest whole number, if necessary.
Answers: 2
Mathematics, 21.06.2019 20:50, tra10money
An object is translated by (x + 4, y - 2). if one point in the image has the coordinates (5, -3), what would be the coordinates of its pre-image? (9, -5) (1, -5) (9, -1) (1, -1)
Answers: 1
A company produces two types of bicycles; mountain bikes and racing bikes. It takes 7 hours of assem...
Health, 18.12.2020 03:00
Mathematics, 18.12.2020 03:00
Mathematics, 18.12.2020 03:00
Computers and Technology, 18.12.2020 03:00