Mathematics, 07.04.2020 16:22, 4804053670
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a random sample of 36 bolts is selected and the bolt diameters recorded. If the resulting sample mean is less than 0.730 inches or greater than 0.770 inches, the process is shut down for adjustment. The standard deviation for diameter is 0.04 inches. What is the probability that the manufacturing line will be shut down unnecessarily? (Hint: Find the probability of observing an x in the shutdown range when the true process mean really is 0.75 inches. Round your answer to four decimal places.)
Answers: 2
Mathematics, 21.06.2019 15:30, southerntouch103
Gretchen is setting up for a banquet. she has 300 chairs and needs to distribute them evenly among t tables. how many chairs should she put at each table? write your answer as an expression.
Answers: 2
Mathematics, 21.06.2019 17:40, challenggirl
Find the volume of the described solid. the solid lies between planes perpendicular to the x-axis at x = 0 and x=7. the cross sectionsperpendicular to the x-axis between these planes are squares whose bases run from the parabolay=-31x to the parabola y = 30/x. a) 441b) 147c) 864d) 882
Answers: 1
Mathematics, 21.06.2019 23:00, ronniethefun
Edger needs 6 cookies and 2 brownies for every 4 plates how many cookies and brownies does he need for 10 plates
Answers: 1
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a ran...
Physics, 11.12.2019 06:31
English, 11.12.2019 06:31
Mathematics, 11.12.2019 06:31