A project has an expected duration of 34 weeks with a critical path variance of 6.
1) Suppose the project network is given and the critical path is identified on the network.
2) Suppose the normal time, crash time, and the associated cost for each activity is given.
You have been asked by your supervisor to prepare a research paper that addresses the follow criteria:
a) What is the probability that the project will be completed in 32 weeks or less?
b) If the project is to be shortened by four days, list the process you would take to determine which activities, in order of reduction, would be shortened and the resulting cost.
c) Describe project cost and the requirements for its determination and application ina production facility.
d) Analyze the implications of changes in the parameters of project timing and cost determination.
e) Evaluate the application of project cost and timing concepts on a firm's business operations. What is the probability that the project will be completed in 32 weeks or less?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 02:30, christopherluckey7
In the next 10 month, colin wants to save $900 for his vacation. he plans to save $75 each of the first 8 months. how much must he save each of the last 2 months in order to meet his goal if he saves the same amount each month ?
Answers: 1
image
Mathematics, 22.06.2019 04:00, ineedtopeebeforethec
Acollege student takes out a $7500 loan from a bank. what will the balance of the loan be after one year(assuming the student has not made any payments yet) a. if bank charges 3.8% interest each year ?
Answers: 1
image
Mathematics, 22.06.2019 05:30, 22chandlerlashley
Which of the following functions is graphed above? a. f(x) = 4log(x + 4) b. f(x) = -4log(x + 4) c. f(x) = 4log(-x - 4) d. f(x) = -4log(-x + 4)
Answers: 2
image
Mathematics, 22.06.2019 07:30, pssluke
Acookie manufacturer advertised that every bag of a certain type of cookie contained at least 1000 chocolate chips. a consumer group bought 15 bags of cookies from a variety of locations, dissolved the cookies in water and hand-counted the number of chocolate chips in each bag. the average number of chocolate chips was 1161.6 and the standard deviation 117.6. a26. assuming a normal distribution, a 95% confidence interval for the mean number of cookies in each bag is (a) 1108.37 (b) 1108.13 (c) 1102.09 (d) 1096.86 to 1226.34 to 1214.83 to 1215.07 to 1221.11 (e) 1096.47 to 1226.73
Answers: 3
Do you know the correct answer?
A project has an expected duration of 34 weeks with a critical path variance of 6.
1) Suppose...

Questions in other subjects:

Konu
Mathematics, 06.05.2020 07:16
Konu
Social Studies, 06.05.2020 07:16