Mathematics, 03.04.2020 00:55, thonio091
Bruce's Material Company hauls gravel to a construction sito, using a small truck and a large truck. The carrying capacity and operating cost per load are given in the accompanying table. Bruce must deliver a
minimum of 280 cubic yards per day to satisfy his contract with the builder. The union contract with his drivers requires that the total number of loads per day is a minimum of 10. How many loads should be
made in each truck per day to minimize the total cost?
Small Truck Large Truck
Capacity (yd) 40
70
Cost per Load
$69 $56
In order to minimize the total cost, the number of loads in a small truck that should be made is
and the number of loads in a large truck that should be made is
Answers: 3
Mathematics, 21.06.2019 16:30, brennanjb00
Jorge planted flowers in his garden he planted one row of 12 tulips and one row of 36 daisies george's friend kylie has a garden with 75 flowers in it kylie's garden only contains tulips and daisies. is it possible for kylie‘s garden she have the same ratio of tulips to daisies as george's garden?
Answers: 1
Mathematics, 21.06.2019 20:00, michelle5642b
Find all solutions for 2y - 4x =2 y = 2x + 1 site: socratic. org
Answers: 1
Mathematics, 21.06.2019 22:40, alialoydd11
Afunction g(x) has x-intercepts at (, 0) and (6, 0). which could be g(x)? g(x) = 2(x + 1)(x + 6) g(x) = (x – 6)(2x – 1) g(x) = 2(x – 2)(x – 6) g(x) = (x + 6)(x + 2)
Answers: 1
Bruce's Material Company hauls gravel to a construction sito, using a small truck and a large truck....
Chemistry, 01.04.2021 18:20
Mathematics, 01.04.2021 18:20
Mathematics, 01.04.2021 18:20
Health, 01.04.2021 18:20
English, 01.04.2021 18:20