Mathematics
Mathematics, 02.04.2020 19:26, baileypreston311

Approximately 3.25 x 10^6 cubic yards of material were used to build Boulder Dam on the Arizona-Nevada border. The New Cornelia Tailings Dam in Arizona used 2.74 x 10^8 cubic yards of material.
How many more cubic yards of material were used to build the Cornelia Tailings Dam than Boulder Dam?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, amiechap12
Let f(x) = x+3 and g(x) = 1/x the graph of (fog)(x) is shown below what is the range of (fog)(x)?
Answers: 2
image
Mathematics, 21.06.2019 18:00, nevaehkb
Just tell me how to set up the equation.
Answers: 2
image
Mathematics, 21.06.2019 19:30, MagicDragon4734
Which of the points a(6, 2), b(0, 0), c(3, 2), d(−12, 8), e(−12, −8) belong to the graph of direct variation y= 2/3 x?
Answers: 2
image
Mathematics, 21.06.2019 20:30, brandisouthern9
Awasher and a dryer cost $701 combined. the washer costs $51 more than the dryer. what is the cost of the dryer?
Answers: 1
Do you know the correct answer?
Approximately 3.25 x 10^6 cubic yards of material were used to build Boulder Dam on the Arizona-Neva...

Questions in other subjects: