A given project’s expected duration along its critical path is 50 days, based on optimistic, most likely, and pessimistic duration estimates. What is the probability that the project will finish on or before 50 days?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, gbrightwell
Alicense plate is to consist of 44 digits followed by 55 uppercase letters. determine the number of different license plates possible if the first and second digits must be? odd, and repetition is not permitted.
Answers: 3
image
Mathematics, 21.06.2019 14:20, goopatogen5889
Micah solves a linear equation and concludes that x = 0 is the solution. his work is shown below. (1 – 3x) = 4(– + 2) 0 = x which statement is true about micah’s solution?
Answers: 2
image
Mathematics, 21.06.2019 17:40, zitterkoph
Which basic geometric term has no width, no length, and no thickness? line b. point c. angle d. plane
Answers: 2
image
Mathematics, 21.06.2019 20:30, mariahcid904
Find the solution(s) to the system of equations. select all that apply y=x^2-1 y=2x-2
Answers: 2
Do you know the correct answer?
A given project’s expected duration along its critical path is 50 days, based on optimistic, most li...