Name
At a factory, two machines pack bottles into boxes for shipping...
Mathematics, 26.03.2020 02:36, shaylawaldo11
View
ENV68_2_00_
Name
At a factory, two machines pack bottles into boxes for shipping.
Machine A can pack 8 boxes per minute, and Machine B can pack
11 boxes per minute.
1. Before shipment, an inspector found that 7 of the boxes were
defective and could not be shipped. At least 200 boxes were
approved for shipment. Write and solve an inequality to find the
amount of time Machine A spent packing the boxes that were
approved for shipment
Answers: 1
Mathematics, 21.06.2019 21:30, ladydeathanddea
Amira is painting a rectangular banner 2 1/4 yards wide. the banner will have a blue background. amira has enough paint to cover 1 1/2 square yards of the wall. the school colors are blue and yellow, so amira wants to add yellow rectangles on the left and right sides of the blue rectangle. the yellow rectangles will each be 3/4 yards wide and the same height as the blue rectangle. what will be the total area of the two yellow rectangles?
Answers: 3
Mathematics, 25.02.2021 22:40
Mathematics, 25.02.2021 22:40
Mathematics, 25.02.2021 22:40
Mathematics, 25.02.2021 22:40