Mathematics
Mathematics, 24.03.2020 21:37, unknown9263

A construction company is laying concrete for a new building. The company has 4 dump trucks with 1.15 tons of gravel each, and 2 dump trucks with 0.7 tons of sand. How many tons of material will the company use for the new building?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, 5001Je
Give the equations of two different lines that are perpendicular to the line 3x + 4y = 7.
Answers: 1
image
Mathematics, 21.06.2019 18:40, haidenmoore92
Which of the following would be a good name for the function that takes the weight of a box and returns the energy needed to lift it?
Answers: 1
image
Mathematics, 21.06.2019 22:00, actheorian8142
Which is the correct first step in finding the area of the base of a cylinder with a volume of 26x cubic meters and a height of 6.5 meters? v=bh 6.5=b(26x) v=bh v=26pi+(6.5) v=bh v=26pi(6.5) v=bh 26pi=b(6.5)
Answers: 1
image
Mathematics, 21.06.2019 23:00, jetblackcap
Perry observes the opposite parallel walls of a room in how many lines do the plains containing the walls intersect
Answers: 1
Do you know the correct answer?
A construction company is laying concrete for a new building. The company has 4 dump trucks with 1.1...

Questions in other subjects:

Konu
Health, 03.11.2020 16:40