Mathematics, 19.03.2020 07:24, jgcugucgucg
A contractor is required by a county planning department to submit one, two, three, four or five forms (depending on the nature of the project) in applying for a building permit. Let Y- the number of forms required of the next applicant. The probability that y forms are required is known to be proportional to y+1, in other words the PMF of Y is given by p(y)- k(y +1) for y-1,...,5, and 0 otherwise.
(a) What is the value of k?
(b) What is the probability that at most three forms are required?
c) What is the probability that between two and four forms (inclusive) are required?
(d) Could p(y) = y2/50 for y-1, . . . ,5 be the PMF of Y? Explain why or why not.
Answers: 3
Mathematics, 21.06.2019 21:20, KennyMckormic
The radius of the circle below intersects the unit circle at (3/5,4/5). what is the approximate value of theta? 0.6 radians 1.0 radians 36.9 degrees 53.1 degrees
Answers: 3
Mathematics, 21.06.2019 22:30, fredvales19
What fraction is equivalent to 0.46464646··· a. 46⁄99 b. 46⁄999 c. 46⁄100 d. 23⁄50
Answers: 1
Mathematics, 22.06.2019 00:30, kitykay2399
An unknown number x is at most 10. which graph best represents all the values of x? number line graph with closed circle on 10 and shading to the right. number line graph with open circle on 10 and shading to the right. number line graph with open circle on 10 and shading to the left. number line graph with closed circle on 10 and shading to the left.
Answers: 1
A contractor is required by a county planning department to submit one, two, three, four or five for...
Mathematics, 26.03.2021 20:10
Biology, 26.03.2021 20:10
Mathematics, 26.03.2021 20:10
Mathematics, 26.03.2021 20:10
English, 26.03.2021 20:10
Mathematics, 26.03.2021 20:10