Mathematics
Mathematics, 13.03.2020 23:01, eve2055

Ultra high performance concrete (UHPC) is a relatively new construction material that is characterized by strong adhesive properties with other materials. The article "Adhesive Power of Ultra High Performance Concrete from a Thermodynamic Point of View"†described an investigation of the intermolecular forces for UHPC connected to various substrates. The following work of adhesion measurements (in mJ/m2) for UHPC specimens adhered to steel appeared in the article.

107.1 109.5 107.4 106.8 108.1

(c) Predict the resulting work of adhesion value resulting from a single future replication of the experiment by calculating a 95% prediction interval. (Round your answers to two decimal places.)

(d) Calculate an interval for which you can have a high degree of confidence that at least 95% of all UHPC specimens adhered to steel will have work of adhesion values between the limits of the interval. (Round your answers to two decimal places.)

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:00, 22MadisonT
Abakery recorded the number of muffins and bagels it sold for a seven day period. for the data presented, what does the value of 51 summarize? a) mean of bagels b) mean of muffins c) range of bagels d) range of muffins sample # 1 2 3 4 5 6 7 muffins 61 20 32 58 62 61 56 bagels 34 45 43 42 46 72 75
Answers: 2
image
Mathematics, 21.06.2019 21:50, smithsa10630
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 1
image
Mathematics, 21.06.2019 22:00, jamarstand
What is the equation of the line that is parallel to the line with the equation y= -3/4x +1 and passes through the point (12,-12)
Answers: 1
image
Mathematics, 21.06.2019 22:30, thelonewolf5020
Amachine that produces a special type of transistor (a component of computers) has a 2% defective rate. the production is considered a random process where each transistor is independent of the others. (a) what is the probability that the 10th transistor produced is the first with a defect? (b) what is the probability that the machine produces no defective transistors in a batch of 100? (c) on average, how many transistors would you expect to be produced before the first with a defect? what is the standard deviation? (d) another machine that also produces transistors has a 5% defective rate where each transistor is produced independent of the others. on average how many transistors would you expect to be produced with this machine before the first with a defect? what is the standard deviation? (e) based on your answers to parts (c) and (d), how does increasing the probability of an event a↵ect the mean and standard deviation of the wait time until success?
Answers: 3
Do you know the correct answer?
Ultra high performance concrete (UHPC) is a relatively new construction material that is characteriz...

Questions in other subjects:

Konu
Mathematics, 26.01.2021 01:00
Konu
Mathematics, 26.01.2021 01:00
Konu
Chemistry, 26.01.2021 01:00