Mathematics
Mathematics, 12.03.2020 06:40, ingridx0

16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on average once every 20 cycles. When a line stop occurs, average downtime is 3.0 min. Cost of each starting work part is $1.55, and the cost to operate the line is $66/hr. Tooling cost is $0.13 per work part. Determine (a) average hourly production rate, (b) line efficiency, and (c) cost of a workpiece produced.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, jksike223
Ablock of wood is a cube whose side is x in. long. you cut off a 1-inch thick piece from the entire right side. then you cut off a 3-inch thick piece from the entire top of the remaining shape. the volume of the remaining block is 2,002 in3. what are the dimensions of the original block of wood?
Answers: 2
image
Mathematics, 21.06.2019 16:40, joannachavez12345
What is the average rate of change for this function for the interval from x=2 to x=4 ?
Answers: 2
image
Mathematics, 21.06.2019 19:20, mrskhg3395
Based on the diagram, match the trigonometric ratios with the corresponding ratios of the sides of the triangle. tiles : cosb sinb tanb sincposs matches: c/b b/a b/c c/a
Answers: 2
image
Mathematics, 21.06.2019 21:30, lraesingleton
Acompany charges $0.10 for each letter engraved. bobby plans to spend no more than $5.00 on the engraving on a jewelry box. write and solve an inequality to find the maximum number of letters he can have engraved.
Answers: 1
Do you know the correct answer?
16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on a...

Questions in other subjects:

Konu
World Languages, 23.03.2021 21:40