An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. Show all relevant calculations. a. What are the minimum and maximum cycle times? b. What range of output is theoretically possible for the line? c. What is the minimum number of workstations needed if the maximum output rate is to be sought? d. What cycle time will provide an output rate of 125 units per day? e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, apexdude2020
The swimming pool is open when the high temperature is higher than 20∘c. lainey tried to swim on monday and thursday (which was 33 days later). the pool was open on monday, but it was closed on thursday. the high temperature was 30 ∘c on monday, but decreased at a constant rate in the next 33 days. write an inequality to determine the rate of temperature decrease in degrees celsius per day, d, from monday to thursday.
Answers: 3
image
Mathematics, 21.06.2019 20:20, krystenlitten
Pls brainliest will be awarded if answer is correct
Answers: 1
image
Mathematics, 21.06.2019 20:20, kenken2583
Complete the input-output table for the linear function y = 3x. complete the input-output table for the linear function y = 3x. a = b = c =
Answers: 2
image
Mathematics, 21.06.2019 21:00, cjgonzalez981
Type the correct answer in each box. use numerals instead of words. if necessary, use / fir the fraction bar(s). the graph represents the piecewise function: h
Answers: 3
Do you know the correct answer?
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total tim...

Questions in other subjects: